Item |
Year |
Replace flooring in master bedroom, hallway and foyer
|
2021 |
Replaced all interior doors |
2021 |
Roof & Gutters
|
2020 |
Windows/Doors replaced (Renewal by Andersen) |
2020 |
Buried outdoor power/cables underground and upgraded power
|
2019 |
Vents cleaned |
2019 |
Re-did whole master bathroom – toilet/shower/sink/flooring/electrical updated
|
2018 |
Garage motor |
2018 |
Outdoor lateral sewer |
2016 |
Front door |
|
Insulation r44 installed in attic |
2015 |
Roof |
2015 |
Soffitt & gutters/carpet in breezeway
|
|
Electrical panel box in basement |
2014 |
Furnace |
2013 |
Added air conditioner |
2013 |
Garage door & motor |
2013 |
Kitchen cabinets & ceramic flooring |
2013 |
Main bath - cabinets, ceramic flooring, bath tub |
2013 |
Carpet in living room and bedrooms/ |
2013 |
Paint and primed whole house |
2013 |
Removed & Replaced old landscaping |
2013 |
All light fixtures, updated outlets switches and covers, electrical updated in kitchen and main bathroom, |
2013 |
Hot water heater |
|